REALHUB is on fire today

Properties

Browse or get in touch to schedule a walkthrough.

  • Nearby me
Price range

Popular Features

Community Features

Association

Property Features

Waterfront

View

Exterior Features

Interior Features

Style

10000 properties match your criteria

Updated 1 minute ago

E-Alert name

New on site today
Coming soon
Set on 1.12 acres within the gated community of Steeplechase, this completely reimagined 3,670-square-foot, single-story estate occupies an expansive corner homesite. The main residence offers five bedrooms, four full bathrooms and a powder room, including a dedicated cabana bath, complemented by a separate 946-square-foot, two-bedroom casita. A sweeping driveway and generous frontage create an impressive sense of arrival, while an extensive renovation transformed the residence from the inside out with complete impact glass, a 2025 concrete tile roof, redesigned interiors and substantial improvements throughout. Custom double front doors open into the foyer and immediately reveal an expansive great room, where ceilings raised to 13 feet and large expanses of glass create dramatic volume and an abundance of natural light. Generously proportioned for multiple seating and entertaining areas, this central space establishes the open character of the home and flows naturally into the surrounding living and dining spaces. Wide-plank wood-look porcelain tile flooring, substantial custom baseboards and recessed lighting carry throughout. Just off the garage, an open mudroom-style hallway lined with custom cabinetry provides extensive built-in storage and an organized everyday entry into the home.At the heart of the residence, the completely redesigned kitchen features warm ivory quartz countertops with distinctive taupe veining and a matching full-height quartz backsplash. Custom paneled cabinetry incorporates detailed millwork, glass-front display cabinets and extensive drawer and pantry storage. An oversized center island features an integrated sink, generous workspace and abundant storage before extending into a custom built-in banquette for casual dining. The kitchen is equipped with a full Thermador appliance suite, including a professional-style gas cooktop with pot filler, custom integrated hood and paneled dishwasher, complemented by a paneled Sub-Zero refrigerator and oversized Sub-Zero wine refrigerator.The primary suite is designed as a private retreat, anchored by a dramatic glass-enclosed spa and wet room. The soaking tub, oversized shower and steam room are incorporated together within the enclosure, creating an immersive spa experience within the primary bath.The separate two-bedroom casita provides an independent living environment with a full bathroom, kitchenette, living area and private porch. Positioned apart from the main residence, it offers comfortable accommodations for guests, extended family or use as a private in-law suite.Outside, the scale of the corner homesite provides expansive lawns, mature landscaping and generous space surrounding the residence. The 15' x 30' pool is currently operated as a chlorine pool and is equipped for saltwater use, with covered and open-air patio areas extending the home's living and entertaining spaces outdoors. An outdoor shower, cabana bath access and fencing along the rear of the property add functionality and privacy to the outdoor setting.Additional features include a two-car attached garage with an impact-rated garage door, interior laundry room, custom closet cabinetry, walk-in closets, central vacuum, French doors, natural gas connection, generator hookup, well irrigation and complete storm protection. 5664 High Flyer Road S brings together more than an acre of land, a substantially renovated main residence, expansive indoor and outdoor living spaces and a private guest residence within Steeplechase in Palm Beach Gardens.
#B26078377

Palm Beach Gardens

5664 High Flyer Road S

7 Beds

5 Baths

3,670 Sq.Ft.

$4,695,000

MLS#: B26078377

New on site 1 day ago
This charming turnkey-ready 3-bedroom, 2-bathroom home is nestled in the heart of Wellington, offering the perfect blend of comfort and convenience. Located just minutes from the area's premier horse venues, it's ideal for equestrian enthusiasts. The home features a cozy, welcoming atmosphere with bright and airy living spaces. Situated in a  gated community, residents can enjoy access to the community pool, perfect for relaxing and unwinding. This home offers peace of mind and is perfect for those looking to be close to Wellington's best attractions and equestrian events.
#B26078356

Wellington

1487 Windship Circle

3 Beds

2 Baths

1,368 Sq.Ft.

$6,000

MLS#: B26078356

New on site today
Great location and Completely remodeled.   The main house has 4 bedrooms and 2 bathrooms.  There is also a studio on the right side of the property currently rented at $1200 per month, making it a total of 5 bedrooms and 3 bathrooms.  Fantastic income opportunity for investors or first-time home buyers who wish to collect $14400 yearly rent as extra income.  Hurry take advantage of this rare opportunity
#B26078362

Lantana

1408 W BROOME Street

4 Beds

2 Baths

1,578 Sq.Ft.

$465,000

MLS#: B26078362

New on site 1 day ago
BRAND NEW ROOF & 2026 FULL IMPACT WINDOWS AND DOORS!   Comprehensively reimagined in 2026, this 4-bedroom plus den, 3-bath residence offers a fresh take on one of Cambridge at Abacoa's most desirable floor plans. Set on an oversized corner lot with ROOM FOR A POOL overlooking neighborhood green space and directly across from the community pool and playground, the 2,670-square-foot home has been thoughtfully renovated from top to bottom with an emphasis on timeless design, functionality and quality.   At the heart of the home is a completely redesigned kitchen featuring expanded, ceiling-height cabinetry, an oversized 8+ foot island with Taj Mahal quartz and ogee edge, custom vented wood hood, workstation sink, Café appliances, 36-inch GE Profile induction cooktop, double wall ovens and designer Rejuvenation lighting.    Unique to this home, the original pass-through between the kitchen and dining room was completely reimagined as a true butler's pantry, adding custom cabinetry, dual-zone wine refrigeration, natural Belvedere quartzite countertops and backsplash, and checkerboard tile flooring—creating both additional storage and a distinctive entertaining space not typically found in this floor plan.   All three full bathrooms were completely renovated with new cabinetry, tile, countertops, plumbing fixtures, lighting and glass, including an expanded double vanity and frameless shower in the primary suite. The renovation continues throughout with wide-plank wood-look flooring, 7¼-inch baseboards, substantial door casings, designer lighting, custom glass French doors at the den, and a fully redesigned laundry room with cabinetry, workstation sink and Taj Mahal quartz and 2026 LG smart washer and dryer.   Beyond the finishes, the major improvements have already been addressed: new roof in 2025, full impact windows and doors in 2026, 2021 AC, and 2023 water heater. Additional upgrades include new exterior lighting and fans, smart-home features, a newly fenced and sodded backyard, and an epoxy-finished two-car garage.
#B26078236

Jupiter

126 PEABODY Drive

4 Beds

3 Baths

2,670 Sq.Ft.

$1,399,000

MLS#: B26078236

New on site today
Property is renovated and section8 voucher holders are welcome
#B26078405

Lantana

1408 W Broome Street

4 Beds

2 Baths

1,399 Sq.Ft.

$3,400

MLS#: B26078405

New on site today
Charming and move-in ready studio apartment in prime East Hollywood! Features clean tile flooring throughout, great natural light, and a functional, low-maintenance layout. Utilities included (water and electricity) for hassle-free living. Comes with assigned off-street parking and convenient on-site laundry facilities. Centrally located just minutes from Downtown Hollywood dining, ArtsPark at Young Circle, Oakwood Plaza, and I-95, and under 15 minutes to Hollywood Beach and FLL Airport. Vacant, easy to show on lockbox, and fast approval process!
#B26078406

Hollywood

1826 Sherman Street Apt 6

None Beds

1 Baths

524 Sq.Ft.

$1,550

MLS#: B26078406

New on site today
Your waterfront paradise awaits in Pompano Beach with a 50-foot dock and direct ocean access. Welcome to coastal living at its finest. This charming single-story waterfront residence offers 1,701 square feet of comfortable living space tailored for boating enthusiasts and lovers of the Florida lifestyle. Situated in an established Pompano Beach neighborhood, this home seamlessly combines functional design, low-maintenance living, and immediate access to the open ocean. Features include a private 50-foot dock with direct ocean access so you can bring your boat and set sail right from your back door. The home offers effortless single-story living with two spacious bedrooms and two full baths. An attached two-car garage provides room for vehicles and gear.
#B26078398

Pompano Beach

420 SE 14TH Avenue

2 Beds

2 Baths

1,701 Sq.Ft.

$925,000

MLS#: B26078398

New on site today
Great opportunity in a 55+ community! This second-floor 2-bedroom, 2-bathroom condo offers plenty of potential for those looking to create a home that fits their own style. The unit features an in-unit washer and dryer and a functional layout ready for your personal updates and remodeling vision. Ideal for a first-time homebuyer or buyer looking for an affordable opportunity to make a space their own. Convenient community living with the chance to add value through renovations. Bring your vision and make this condo your own!
#B26078396

Delray Beach

189 Saxony D

2 Beds

2 Baths

880 Sq.Ft.

$72,900

MLS#: B26078396

New on site today
Discover your ideal retreat in this stunning 2-bedroom, 2-bathroom residence, complete with a charming balcony that offers a picturesque view of the private community pool. Just a short stroll away from the beach, this home combines comfort and convenience, making it the perfect getaway or permanent residence. Don't miss out on this incredible opportunity!
#B26078400

Vero Beach

1727 Jimmy Buffett Mem Highway 107

2 Beds

2 Baths

990 Sq.Ft.

$1,875

MLS#: B26078400

New on site today
Bright, move-in ready 1-bed, 1-bath ground-floor apartment in East Hollywood. Offered unfurnished for $1,750/month or fully furnished. Clean tile flooring throughout, great natural light, and utilities included (water and electricity). Includes assigned parking and on-site laundry facilities. Centrally located minutes from Downtown Hollywood, Young Circle, Oakwood Plaza, and I-95, and under 15 minutes to Hollywood Beach and FLL Airport. Vacant, easy to show on lockbox, and rapid approval!
#B26078407

Hollywood

1826 Sherman Street Apt 8

1 Beds

1 Baths

524 Sq.Ft.

$2,000

MLS#: B26078407

New on site today
Coming soon
Welcome to this spacious, fully furnished, turnkey condo situated on the 9th hole. Featuring 2-bedrooms, 2-bathrooms, an oversized 23 foot screened in balcony with tons of natural light & beautiful sunset views. The primary bedroom offers a large walk in closet and on suite bathroom. The unit features a washer and dryer, lots of storage and accordion shutters for peace of mind. This active community has live entertainment, shows, movies, on site restaurant, fitness center, tennis, pickle ball courts, pool & more. The condo fee includes water, cable, Wi-Fi & exterior building insurance.
#B26078412

Lake Worth

3465 Via Poinciana 405

2 Beds

2 Baths

1,156 Sq.Ft.

$145,000

MLS#: B26078412

Beautiful townhome, walking distance to the water. Quiet neighborhood
#B26076290

Tequesta

3900 SE COUNTY LINE Road 27D

2 Beds

2 Baths

1,325 Sq.Ft.

$2,550

MLS#: B26076290

New on site today
TOP FLOOR GOLF VIEW POOL SIDE LOCATION. YOU WILL HAVE IT MADE IN THE SHADE WITH THIS SPACIOUS 2 BEDROOM 2 FULL BATH SPLIT BEDROOM FLOOR PLAN. ENTRY FOYER, LARGE LIVING ROOM DINING AREA CAN HANDLE LARGE FURNITURE, EAT IN KITCHEN, FLORIDA ROOM. MAIN BEDROOM LARGE ENOUGH FOR KING SIZE BEDROOM SET. GUEST BEDROOM LARGE ENOUGH FOR QUEEN SIZE BEDROOM SET.  BIG WASHER DRYER IN UNIT. EAT IN KITCHEN. NEW ROOFS INSTALLED 2025 WITH NO SPECIAL ASSESSMENT. ASSOCIATION HAS EXCELLENT RESERVES. 2 HEATED POOLS, SAUNAS, CLUBHOUSE WITH: BANQUET HALL; CATERING KITCHEN; LIBRARY; EXERCISE ROOM; BILLIARDS ROOM; FULLY STAFFED CONDO OFFICE OPENED Mon-Fri 9:00-5:00 and 5 CUSTODIANS TAKING CARE OF BUILDINGS & GROUNDS. ALL LOCATED JUST 11 MILES FROM THE BEACH. CALL NOW AND SEE OR CHECK OPEN H... IF YOU CAN WAIT?
#B26078363

Margate

7624 NW 18TH Street 407

2 Beds

2 Baths

1,000 Sq.Ft.

$110,000

MLS#: B26078363

New on site today
Experience refined waterfront living at AQUARIUS, an exclusive boutique building of only 15 residences in prime Fort Lauderdale. This beautifully appointed 3BR/3.5BA unit is offered FULLY FURNISHED and features a semi-private elevator, elegant finishes, floor-to-ceiling windows, generous closet space and a thoughtfully designed, well-distributed floor plan. Enjoy water views from two balconies with north and south exposures, plus a beautiful sized pool directly on the Intracoastal. Includes 2 covered garage spaces in an EV-ready garage. Dockage up to 37' available. Low maintenance fees.  Located in the Bayview School district, minutes from the beach, The Galleria, Las Olas, dining and shopping. A rare turnkey opportunity combining luxury, privacy and exceptional value.
#B26078392

Fort Lauderdale

2770 NE 14TH Street 203

3 Beds

3 Baths

2,077 Sq.Ft.

$1,779,000

MLS#: B26078392

Nice and large 2 bedroom 2 full baths apartment in a beautiful neighborhood. New kitchen cabinets . Porcelain tile and laminate flooring. Washer and dryer in unit, storage room, spacious bedrooms. Resort stile neighborhood with gym, pool , plenty of parking, and other amenities. Excellent location, with easy access to the Sawgrass and Florida Turnpike and across from Promenade.
#B26070622

Coconut Creek

5061 Wiles Road 205

2 Beds

2 Baths

1,246 Sq.Ft.

$2,250

MLS#: B26070622

1 2 3 4 5 ... 666
* Listings identified with the FMLS IDX logo come from FMLS and are held by brokerage firms other than the owner of this website. The listing brokerage is identified in any listing details. Information is deemed reliable but is not guaranteed. If you believe any FMLS listing contains material that infringes your copyrighted work please click here to review our DMCA policy and learn how to submit a takedown request. © 2024. First Multiple Listing Service, Inc.
 - property

Send a message

Message successfully sent.

Your message

What is 3 + 4 ?

Reason for contacting?

I agree to receive email communication and understand I can unsubscribe at any time.

I agree to be contacted by Options 1 Realty via call, email, and text for real estate services. To opt out, you can reply 'stop' at any time or reply 'help' for assistance. You can also click the unsubscribe link in the emails. Message and data rates may apply. Message frequency may vary. Privacy Policy

Sign Out

Virtual Assistant

Would you like to take the next step with this property? We can help you schedule a showing or virtual tour, or send you more details.

Yes, I would like more information.

Thank You for Your Reply, One of Our Agents will contact you as soon as possible

No, maybe later.

Thank you, you can always contact me via email, phone number or through the contact form.

Realhub AI

Lucy - Your AI-Powered Realtor

Update Your Temporary Password

Personalize your search

Enter your email and we'll notify you immediately when new listings match what you're looking for.

or enter email address

Already have an account ? Login here

Continue your home search

I agree to receive communications and understand I can unsubscribe at any time.

I agree to be contacted by Options 1 Realty via call, email, and text for real estate services. To opt out, you can reply 'stop' at any time or reply 'help' for assistance. You can also click the unsubscribe link in the emails. Message and data rates may apply. Message frequency may vary. Privacy Policy

Already have an account ? Login here

We use cookies

We use cookies primarily for analytics to enhance your experience. By accepting, you agree to our use of these cookies. You can manage your preferences or learn more about our cookies policy.