REALHUB is on fire today

Properties

Browse or get in touch to schedule a walkthrough.

  • Nearby me
Price range

Popular Features

Community Features

Association

Property Features

Waterfront

View

Exterior Features

Interior Features

Style

10000 properties match your criteria

Updated 1 minute ago

E-Alert name

Welcome to Residence 21C/D at The Plaza of the Palm Beaches. With over 4,400 square feet, east and west facing terraces, and your own private foyer this massive floor plan allows this residence to truly live like a home in the sky. 
 
The main living areas feature wide plank oak flooring imported from Germany and boasts breathtaking panoramic views of the Intracoastal, Palm Beach Island, and the Atlantic Ocean. The kitchen is outfitted with top-of-the-line Sub-Zero and Miele appliances making this a chef's dream! The 1st primary suite includes two en-suite bathrooms, both finished with custom marble mosaic tiles, an oversized walk-in closet, and a secondary closet for additional space. The primary suite has plenty of natural light and access to the private west-facing terrace.

The 2nd primary suite, on the opposite side of the apartment, features a walk-in closet, a large soaking tub, separate shower, dual sinks, and its own private balcony. The en-suite bathroom is finished with Waterworks marble mosaic floors and marble countertops. The additional guest bedroom is bright and comfortable and features its own en-suite bathroom. There is a large library that can serve as a convertible 4th bedroom with commanding views of the Intracoastal and beyond to the Atlantic Ocean.

Other features of the condo include Lutron-controlled solar shades throughout, with blackout shades in the bedrooms, and a full-sized laundry room with brand new LG washer and dryer.

The Plaza stands in a class of its own as a luxury condominium offering two swimming pools, fitness center, sauna, pickleball courts, 24-hour valet, concierge, security, and is located all within two minutes of Palm Beach Island.
#R11040645

West Palm Beach

525 S Flagler Drive 21 C/D

3 Beds

4 Baths

4,018 Sq.Ft.

$4,950,000

MLS#: R11040645

Two story home in Royal Palm Yacht & Country Club on 95' of waterfront with direct Intracoastal & Ocean access. Home sits on the Butterfly Palm Waterway and has private dock with shore power, LED lights, and water. Features include front and back staircases, movie theater with stadium seating and bar area, gourmet kitchen with top-of-the-line appliances and large walk-in pantry, library with custom built-in shelving and wet bar, two-story formal living room, formal dining room, 1st floor master suite, all impact glass windows & doors, whole house generator, natural gas, and 4-zone air conditioning. Two covered patios, heated pool & spa, lush tropical landscaping for privacy, front circular marble driveway and a 3 car garage with built-in storage cabinets.
#R10209703

Boca Raton

401 E Coconut Palm Road

6 Beds

7 Baths

6,433 Sq.Ft.

$4,950,000

MLS#: R10209703

Best value in Harbor Beach.  Luxury home in move-in condition or build new home on huge  lot (150'x120').  New dock, deep water and 140' wide canal with quick ocean access.   Circular drive and 3 car garage.  2 master suites, large rooms and high ceilings.  Large heated pool.  Surrounded by $10,000,000 + homes.  Private beach facility and 24/7 security patrol available.
#F10032054

Fort Lauderdale

2541 Del Lago Drive

5 Beds

5 Baths

4,724 Sq.Ft.

$4,950,000

MLS#: F10032054

BRAND NEW FOUR SEASONS CORNER PRIVATE RESIDENCES WITH VIEWS OF OCEAN, MARINA, SKYLINE , Eighteenth floor, private residence with 2 bedroom, 2 1/2 bath and a Northwestern exposure with direct intracoastal and ocean views. Dramatic floor to ceiling glass and gracious open terraces afford you ample natural light throughout the home. Gourmet kitchen with custom lacquered cabinetry, Sub Zero Wolf appliances. Primary owners retreat configuration optimizes privacy between you and your guests. Abundant closet space throughout this luxury residence. Baths are adorned with signature marble, custom oak cabinetry, and brushed nickel Waterworks fittings.
#F10288495

Fort Lauderdale

525 N Ft Lauderdale Beach 1804

2 Beds

2 Baths

2,242 Sq.Ft.

$4,950,000

MLS#: F10288495

New Construction Ready Fall 2022 - Contemporary estate home on a large 4.2 acre private direct intracoastal lot.  Bring your yacht and your car collection!  Single level living with 3 Bedrooms + Media + Office in main home and a detached guest house that includes a suite with kitchen & bath.  8 car garage spaces with room for stacked lifts.  Dramatic entry ways, over-sized glass windows & sliders with exceptional resort style pool and lushly landscaped views, volume 13ft ceilings, large open indoor & outdoor spaces, all bedrooms have ensuites.   A state-of-the art custom home w/ exceptional attention to detail including decorative wood ceilings, dropped ceilings, custom fireplace, wine storage, double kitchen island, owner's retreat, spacious covered loggia, and so much more coming soon!
#R10818185

Hobe Sound

9741 SE Gomez Avenue

4 Beds

4 Baths

6,378 Sq.Ft.

$4,950,000

MLS#: R10818185

With a cul-de-sac location and gated entrance this stunning Intracoastal estate on a point lot has 270' of water frontage, East exposure and views of a nature preserve. The 145' deepwater dock will handle large vessels up to approximately 90', has water, 220/110 amp service and two boat lifts. The custom kitchen offers a breakfast bar, center-island and a large walk-in pantry. Other features include a custom built-in wet bar with wine cooler and refrigerator, gas fire place, large office with built-in's, his and hers baths in the master with exercise room and California closeting, full impact windows, tank-less gas water heater and a 45 KW whole house generator with automatic transfer switch. A large media room could be used or converted into a 5th bedroom.
#R10742138

Palm Beach Gardens

14324 Paradise Point Road

4 Beds

5 Baths

4,800 Sq.Ft.

$4,950,000

MLS#: R10742138

Welcome to 3139 Miro Drive South, nestled in the prestigious Frenchman's Creek community of Palm Beach Gardens. This 5466 sq. ft. single-story home offers 4 bedrooms, 3 full plus 1 half baths, and sits on a generous .52 -acre cul-de-sac lot with stunning lake views. Built with solid construction and contemporary design, this property boasts great bones and oversized rooms—perfect for customizing to your taste. Enjoy the ultimate Florida lifestyle with a private heated pool and spa, screened patio, and access to world-class amenities including golf, tennis, fitness center, and beach club. With a little TLC, this home can become your personal paradise in one of Palm Beach Gardens' most exclusive neighborhoods.
#R11131257

Palm Beach Gardens

3139 Miro Drive S

3 Beds

3 Baths

4,037 Sq.Ft.

$4,950,000

MLS#: R11131257

Exceptional development opportunity on a rare oversized lot in the heart of Coconut Grove. Offered with fully approved and permitted plans for a ~9,500+ SF luxury residence, with an estimated completed value of $18M+. The existing structure is already in demolition, allowing for an immediate transition into construction. A true turnkey project ideal for a developer or end-user seeking to fast-track a premier build in a prime location. Estimated build timeline is approximately 20 months. A full, experienced team is in place—including architectural plans by Astro Station, interior design, and contractors—all of which can be seamlessly transferred to the buyer, significantly reducing execution risk and time to completion.
#A11986693

Miami

1953 Tigertail Avenue

3 Beds

3 Baths

2,620 Sq.Ft.

$4,950,000

MLS#: A11986693

Wide-open views sweep over the Intracoastal Waterway from this gated Palladian-inspired estate on 125± feet of shoreline.  Elegant landscaping adorns the expansive entrance court and the resort-inspired outdoor entertainment space that stretches across the entire water side of the residence.  Here, the luxurious pool with spillover spa is framed by grand loggias and tiered terraces served by a summer kitchen/bar. MLS DISCLAIMER: The written and verbal information provided including but not limited to prices, measurements, square footages, lot sizes, calculations and statistics have been obtained and conveyed from third parties such as the applicable Multiple Listing Service, public records as well as other sources. All information including that produced by the Sellers or Listing Company are subject to errors, omissions or changes without notice and should be independently verified by any prospect for the purchase of a Property.  The Sellers and Listing Company expressly disclaim any warranty or representation regarding all information.  Prospective purchasers' use of this or any written and verbal information is acknowledgement of this disclaimer and that Prospects shall perform their own due diligence.  Prospective purchasers shall not rely on any written or verbal information provided when entering into a contract for sale and purchase.  Some affiliations may not be applicable to certain geographic areas. If your property is currently listed, please do not consider this a solicitation.   In the event a Buyer defaults, no commission will be paid to either Broker on the Deposits retained by the Seller. "No Commissions Paid until Title Passes."    Buyer pays title insurance, Florida documentary stamps, and all other closing costs for New Construction and land use. Copyright 2016 Listing Company.  All Rights Reserved.
#R10301727

Boca Raton

2633 Spanish River Road

5 Beds

6 Baths

6,414 Sq.Ft.

$4,950,000

MLS#: R10301727

''Brand New'' Streamlined Georgian-inspired Intracoastal estate sited on
85' +/- of waterfrontage and 20,000 lb boat lift.  All major rooms face the Intracoastal with amazing views.  Resort-like pool/patio with spa, entertainment lanai featuring a summer kitchen and boat lift. Shown by appointment only. DISCLAIMER: The written and verbal information provided including but not limited to prices, measurements, square footages, lot sizes, calculations and statistics have been obtained and conveyed from third parties such as the applicable Multiple Listing Service, public records as well as other sources. All information including that produced by the Sellers or Listing Company are subject to errors, omissions or changes without notice and should be independently verified by any prospect for the purchase of a Property.  The Sellers and Listing Company expressly disclaim any warranty or representation regarding all information.  Prospective purchasers' use of this or any written and verbal information is acknowledgement of this disclaimer and that Prospects shall perform their own due diligence.  Prospective purchasers shall not rely on any written or verbal information provided when entering into a contract for sale and purchase.  Some affiliations may not be applicable to certain geographic areas. If your property is currently listed, please do not consider this a solicitation.   In the event a Buyer defaults, no commission will be paid to either Broker on the Deposits retained by the Seller. "No Commissions Paid until Title Passes." Buyer pays title insurance, Florida documentary stamps, and all other closing costs for New Construction and land use. Copyright 2016.  All Rights Reserved.
#R10283987

Boca Raton

788 NE Harbour Drive

5 Beds

6 Baths

6,145 Sq.Ft.

$4,950,000

MLS#: R10283987

Have Seaside Builders build your Gulf Stream Dream home on this beautiful lot.  Plans are ready for another spectacular new construction home in Gulf Stream. The information herein is deemed reliable and subject to errors, omissions or changes without notice.  The information has been derived from architectural plans or county records. Buyer should verify all measurements Buyer must pay Development fee of 1.5% of purchase price at closing.Buyer pays title insurance, Florida documentary stamps, and all other closing costs. Taxes are based on vacant land only and subject to change. 

**SEE SUPPLEMENT** Disclaimer: The information provided herein including but not limited to measurements, square footages, lot sizes, calculations and statistics have been obtained and conveyed from third parties such as the applicable Multiple Listing Service, public records as well as other sources. All information including that produced by the Sellers or Listing Company are subject to errors, omissions or changes without notice and should be independently verified by any prospect for the purchase of a Property.  The Sellers and Listing Company expressly disclaim any warranty or representation regarding all enclosed information.  Prospects' use of any information herein is acknowledgement of this disclaimer and that Prospect shall perform their own due diligence.  Prospects shall not rely on this information when entering into a contract for sale and purchase.  Some affiliations may not be applicable to certain geographic areas. If your property is currently listed, please do not consider this a solicitation.   In the event a Buyer defaults, no commission will be paid to either Broker on the Deposits retained by the Seller. "No Commissions Paid until Title Passes."    Buyer pays title insurance, Florida documentary stamps, and all other closing costs for New Construction and land use. Copyright 2016 Listing Company.  All Rights Reserved.
#R10253516

Gulf Stream

10 Driftwood Landing Spec Road

4 Beds

4 Baths

4,802 Sq.Ft.

$4,950,000

MLS#: R10253516

Nearing Final Completion! This exquisite New Construction home offers seven bedrooms plus an office, eight bathrooms, and 8,247 sq. ft. of refined living space. Walking through the custom 11-foot front door, you are met with direct views of the pool and a sense of spaciousness with 24 feet of ceiling height. There is a wine room just off the formal dining area and an elevator as you come in through the garage. Three upstairs rooms boast private balconies with serene backyard views. The primary suite is a true retreat, complete with double walk-in closets, a cozy sitting area, a huge master bath, and direct pool access. Other features include an air-conditioned garage, a complete summer kitchen, and a full cabana bath. Centrally located in Plantation Acres.
#F10462732

Plantation

11951 SW 3rd Street

7 Beds

7 Baths

8,274 Sq.Ft.

$4,950,000

MLS#: F10462732

This immaculate Saddle Trail property sits on 3.92 acres and is on the south side of Greenbriar - true hacking distance to the horse show! Upon entering the beautiful 2-story 5 bedroom, 4-1/2 bath home, you will find gorgeous hardwood floors throughout. There is a fireplace in the family room/kitchen area. This with the formal living room with volume ceiling makes it the perfect house for entertaining! Beyond the living room is a spacious downstairs bedroom with a full bathroom. There is also a second downstairs bedroom/office and a half bathroom. The upper level of the house has a primary bedroom with breakfast bar and a large bonus room. You can enjoy your morning cup of coffee on the spacious balcony overlooking the relaxing pool and lush landscaping. (more) The equestrian amenities include two barns totaling 17 stalls. The 6-stall barn has an upstairs 2 bedroom, 1 bath apartment with kitchenette and balcony  The 11-stall barn has a 1 bedroom, 1 bath apartment. The barns have a separate driveway.  Each of the barns has tack and feed rooms and washer/dryer. The property also has a 200'x130' riding arena, lunging arena and 11 paddocks. Don't let this exceptional property pass you by!!
#R10745165

Wellington

14289 Equestrian Way

5 Beds

4 Baths

5,499 Sq.Ft.

$4,950,000

MLS#: R10745165

This is a wonderful opportunity to purchase a 5.37 acre working equestrian facility in one of the most prestigious neighborhoods in heart of Wellington, Southfields at Palm Beach Polo. The sixteen stall barn with a club room/office, feed rooms, air conditioned tack room and two apartments has been well maintained. There is plenty of grass turnouts and parking. A covered arena and residence is possible . Walking distance to the Palm Beach Equine Veterinary clinic and access to the Wellington trail system to hack to the horse shows or take a relaxing ride around town.. It's just a short Jaunt to Palm Beach , marinas, beaches and the airport. This superb location in the American horse show capital offers luxury equestrian lifestyle at its finest. So many possibilities.
#R11046367

Wellington

13175 Southfields Road

None Beds

None Baths

5.37 acres

$4,950,000

MLS#: R11046367

Located in much sought after Ocean Ridge where Oceanfront properties are seldom available. Charming home with 7826 sq. ft. under A/C encompasses LR, FR, DR, four bdrms/four and half baths on main level, (marble mstr bath ) and three bdrms,two baths, new second kitchen on lower level. On entering, visitors are amazed by stunning ocean views. 
The living room,family room, kitchen and mstr bdrm open to the pool lanai and spacious lawn. Steps away is a private 101 ft wide pristine beach. Lower level offers a new 2nd kitchen/w lighted onyx cntr &SS appliances, three bdrms including mother-in-law or guest suite and HUGE tiled LL entertainment/playroom. Upgraded three zone A/C, impact slider doors to the pool lanai, huge F.R. windows provide spectacular ocean views. Outstanding Value on 3/4 acr Foyer 15x8. Breakfast room 15x11. Lower Level bedroom - 19x14 with terrace and full bath. Lower Level bedroom 14x9. Lower Level Bedroom 14x13. Garage 26x21. Storage 16x7.
#R10628016

Ocean Ridge

5929 N Ocean Boulevard

7 Beds

6 Baths

7,826 Sq.Ft.

$4,950,000

MLS#: R10628016

1 ... 435 436 437 438 439 ... 666
* Listings identified with the FMLS IDX logo come from FMLS and are held by brokerage firms other than the owner of this website. The listing brokerage is identified in any listing details. Information is deemed reliable but is not guaranteed. If you believe any FMLS listing contains material that infringes your copyrighted work please click here to review our DMCA policy and learn how to submit a takedown request. © 2024. First Multiple Listing Service, Inc.
 - property

Send a message

Message successfully sent.

Your message

What is 3 + 4 ?

Reason for contacting?

I agree to receive email communication and understand I can unsubscribe at any time.

I agree to be contacted by Options 1 Realty via call, email, and text for real estate services. To opt out, you can reply 'stop' at any time or reply 'help' for assistance. You can also click the unsubscribe link in the emails. Message and data rates may apply. Message frequency may vary. Privacy Policy

Sign Out

Virtual Assistant

Would you like to take the next step with this property? We can help you schedule a showing or virtual tour, or send you more details.

Yes, I would like more information.

Thank You for Your Reply, One of Our Agents will contact you as soon as possible

No, maybe later.

Thank you, you can always contact me via email, phone number or through the contact form.

Realhub AI

Lucy - Your AI-Powered Realtor

Update Your Temporary Password

Personalize your search

Enter your email and we'll notify you immediately when new listings match what you're looking for.

or enter email address

Already have an account ? Login here

Continue your home search

I agree to receive communications and understand I can unsubscribe at any time.

I agree to be contacted by Options 1 Realty via call, email, and text for real estate services. To opt out, you can reply 'stop' at any time or reply 'help' for assistance. You can also click the unsubscribe link in the emails. Message and data rates may apply. Message frequency may vary. Privacy Policy

Already have an account ? Login here

We use cookies

We use cookies primarily for analytics to enhance your experience. By accepting, you agree to our use of these cookies. You can manage your preferences or learn more about our cookies policy.